A6MARR

The Baseline reports (using measurements from 2014, before the start of construction of the A6MARR), the Year One reports (using measurements from 2019/2020, after the A6MARR (A555) had opened in 2018) and the Year Five report (using measurements from 2023/2024) can be found on http://www.semmms.info/semmms/reports-business-case/ under the corresponding headings on that page:

  • Monitoring and Evaluation Baseline Report (2016)
  • 1 Year Post-Opening Monitoring and Evaluation
  • 5 Year Post-Opening Monitoring and Evaluation

However, for the Year Five reports, only the Noise Survey Report is listed in that location.  For the remaining Year Five reports, see https://www.stockport.gov.uk/documents/a6-marr-technical-documents

 

High Lane Residents Association has analysed these post-opening reports from the perspective of HIgh Lane.

  • Year One Analysis:  A6MARR_Evaluation_(1).pdf
  • Year Five Analysis: currently under construction. Expected to be available before the July 2025 meeting.

 

 

 